Bids & RFP/SOQs
The City of Brawley's request for bids and proposals, bid results, and notices of award can now be obtained through the City of Brawley Vendor Portal
Requests
The work to be performed consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents. The project is an improvement to an existing park. The existing park is to remain fully operational during construction.
The work includes the following:
New commercial playground area.
New concrete ADA sidewalk from the playground area to the southwest side of an existing sidewalk around an existing basketball court
The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The City of Brawley Main Street A.C. pavement Section between First Street/Highway 86 to Ninth Street is in poor condition. Main Street is 70 feet wide and includes two (2) eastbound traffic lanes, two (2) westbound traffic lanes, and parking lanes on the north and south sides of Main Street. The A.C. improvements include cold planing the existing A.C. pavement surface, crack sealing the cold planed A.C. pavement surface, placing an A.C. leveling course over the crack-sealed cold planed pavement surface, installing an asphalt geosynthetic interlayer over the A.C. leveling course and placing an Asphalt Rubber Hot Mix (ARHM) A.C. pavement top course over the asphalt geosynthetic interlayer. Traffic striping and raising of utility manholes and valve risers and covers are to be accomplished after the ARHM pavement top course is installed.
It is intended that the work be completed in every respect under the Contract, and such items or details not mentioned above that are required by the Plans, Specifications, and Contract documents shall be furnished, performed, placed, constructed, or installed by the Contractor.