Bids & RFP/SOQs

The City of Brawley's request for bids and proposals, bid results, and notices of award can now be obtained through the City of Brawley Vendor Portal

Requests

Submission should be addressed to Public Works Department, 180 South Western Avenue, Brawley, CA 92227 or agutierrez@brawley-ca.gov and be clearly marked PROPOSAL: "PROPOSAL" AIRPORT MANAGER/FIXED BASE OPERATOR(FBO).
Submission should be addressed to Public Works Department, 180 South Western Avenue, Brawley, CA 92227 or agutierrez@brawley-ca.gov.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The City of Brawley intends to improve the communication between the Public Works Department and Main St and 6th Street traffic signals. The improvements consist of installing new PVC conduit with fiber optic cable along Western Ave and Main St and equipment inside the Public Works department, the traffic signal controller cabinet at Main St and 3rd St, and the traffic signal controller cabinet at Main St and 6th St. The work also consists of major modifications at Main St and 6th St including removal of existing traffic signal equipment and mast arms mounted to building exteriors, the installation of new traffic signal poles with foundations, new ADA compliant pedestrian ramps including “bulb-out” civil improvements on the south side of Main Street additional traffic signal related equipment includes, but is not limited to, new signal cable and wiring, new vehicle detector loops and cards, new EVP detectors with mounting, new CCTV with mounting, new 12” LED vehicle heads with mounting, new pushbutton assemblies, new conduit and pull boxes, etc. Minor striping improvements shall also be part of the project.

It is intended that the work be completed in every respect under the Contract, and such items or details not mentioned above that are required by the Contract documents shall be furnished, performed, placed, constructed, or installed by the Contractor.

The work must be completed within 60 calendar days after the commencement date stated in the Notice to Proceed.

Submission should be addressed to Public Works Department, 180 South Western Avenue, Brawley, CA 92227 or agutierrez@brawley-ca.gov.

The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The improvements on C Street from the intersection of Western Avenue to the intersection of First Street consist of micro milling ½-inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 47 feet after micro milling activities have been completed. The contractor shall install a 0.75-inch (0.06-foot) conventional ½-inch hot mix asphalt leveling course. The Contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall install a 1-inch (0.08 feet) ½-inch asphalt rubber hot mix. The improvements also consist of the installation of a handicap ramp.

The improvements on Steven Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue and Ronald Street from the intersection of Richard Avenue to the intersection of Evelyn Avenue consist of micro-milling ½-inch (0.04 feet) for the thru lanes of the street and 1-inch within shoulder areas for an approximate width of 37 feet. After micro milling activities have been completed the contractor shall install a 0.75-inch (0.06 feet) conventional ½ inch hot mix asphalt leveling course. The contractor shall then install an approved paving mat. After the installation of the approved paving mat, the contractor shall then install a 1-inch (0.08 feet) of ½ inch asphalt rubber hot mix. The improvements also consist of the installation P.C.C. handicap ramp and sidewalk.

Awarded